CESMD
Information for Strong-Motion Station
El Centro - Hwy8/Meloland Overpass [Abandoned]
CGS - CSMIP Station 01336
Earthquakes recorded by this station
 
(Station Photograph - click to enlarge)(Sensor Layout - click to see PDF File)
   
Latitude 32.7735 N
Longitude 115.4481 W
Elevation (m) -4
Site Geology Deep alluvium
Vs30 (m/sec) 265 (measured)
Site Class D
Remarks/Notes Site information sources
 
No. of Spans2
Plan ShapeStraight.
Total Length208' (63.4m). Bridge spans are each 104' (31.7m) long.
Width of Deck34' (10.4m)
Construction Date1971
Instrumentation1978. Upgraded 1991. 29 accelerometers on the bridge. 3 accelerometers at a free-field site.
 
Superstructure TypeConcrete box girder connected monolithically to the abutments.
Substructure TypeReinforced concrete piers. 1 column per pier.
Foundation TypeTimber piles supporting a square concrete footing under central pier. Abutments are also supported by timber piles.
RemarksThis bridge was instrumented by CSMIP in 1978 with 26 sensors. The instrumentation was upgraded in 1991 to 32 sensors as part of the interagency agreement between Caltrans and DOC.