CESMD |
Information for Strong-Motion Station |
Corona - I15/Hwy91 Interchange Bridge |
CGS - CSMIP Station 13705 |
Earthquakes recorded by this station |
Latitude | 33.8820 N |
Longitude | 117.5497 W |
Elevation (m) | 187 |
Site Geology | |
Vs30 (m/sec) | |
Site Class |
No. of Spans | 12 |
Plan Shape | Curved and straight. |
Total Length | 1600' (487.7m). Bridge spans range from 100' (30.5m) to 150' (45.7m). |
Width of Deck | 42' (12.8m) |
Construction Date | 1989 |
Instrumentation | 1994. 9 accelerometers on the bridge. |
Superstructure Type | Continuous prestressed concrete box girder with 3 intermediate hinges and cable restrainers. Open end seat abutments. |
Substructure Type | Octagonal concrete columns with parabolic flares along the upper portion. 1 column per bent. |
Foundation Type | Steel piles support bents and abutments. |
Remarks | This bridge was instrumented under an interagency agreement between Caltrans and DOC. |