CESMD
Information for Strong-Motion Station
Leggett - Cedar Creek Bridge
CGS - CSMIP Station 79757
Earthquakes recorded by this station
 
(Station Photograph - click to enlarge)(Sensor Layout - click to see PDF File)
   
Latitude 39.8485 N
Longitude 123.7019 W
Elevation (m) 257
Site Geology  
Vs30 (m/sec)  
Site Class  
 
No. of Spans7
Plan ShapeStraight.
Total Length607' (185.0m). Bridge spans range from 46.5' (14.2m) to 49.5' (15.1m) long, with one 320' (97.5m) main span.
Width of Deck28' (8.5m)
Construction Date1933
Instrumentation1998. 9 accelerometers on the bridge. 3 accelerometers at a free-field site.
 
Superstructure TypeConcrete T-girders simply supported on concrete piers. One end of each girder has an expansion joint.
Substructure TypeCenter span: concrete columns supported by concrete arch. Other spans: concrete columns. 2 columns per bent.
Foundation TypeSpread footings.
RemarksThis bridge was instrumented under the interagency agreement between Caltrans and DOC. A seismic safety gate is installed at the bridge.